Essex Dam Crest Modification and Inflatable Flashboard |
|
|
Project Outline:
The crest modification project involved construction management services including managing the constructors of three separate cofferdams, the installation of reinforced concrete on the existing deck, and the installation of a 900’ Obermeyer Inflatable Flashboard on the new deck, along with the construction of a 16’ x 24’ compressor building.
The work scope included:
- monitoring of the general contractor, contract drillers and contract divers safety and environ-mental performance during construction
- quality control, production tracking, develop-ment of the site safety and environmental control plan and project hazard analysis,
- conducting weekly site safety inspections, project orientations, and preparation and submission of the daily and weekly progress reports to the Owner.
Project Value: |
|
$251,000.00 |
Duration :
|
|
2007-2008 |
| Owner: |
|
ENEL North America Inc. |
| Contact: |
|
John Dollard (978) 681-1900 |
| Consultant: |
|
HL Turner Group Inc. |
| Reference: |
|
Paul Becht (978) 228-1222 |
|