PROJECTS > Power Projects > Active Power Projects > G8 Rotor Poles Replacement

G8 Rotor Poles Replacement Print

Project Outline:

Replace the 48 existing rotor poles in Unit 8 hydroelectric generator (320 MW).

Work scope includes:

  • Working as the owner’s representative
  • Providing Quality Assurance (QA) engineering consultant service
  • Participating in daily contractor tailboard meeting, and generating daily and weekly report
  • Witnessing and verification of the measurement and test programs in the site, and
  • Ensuring work safety on site
Tender Value: $5,200,000.00
Project Dates: June 2009 - September 2009
Owner: BC Hydro
Reference: Bob Walker