| Project Outline:
This project is a 19.5 km long rapid transit connection between Richmond, the Vancouver Airport and downtown Vancouver. The Canada Line is made up of four design components: a bored tunnel section; a cut and cover section; an at grade section and an elevated section.
The cut and cover portion was 6.2 km long with a combination of side-by-side and stacked guideway built out of 95,000m3 cast-in-place concrete in a deep shored trench.
The project included the use of form travelers and unique access platforms to facilitate construction of the guideway.
Project
Value: |
|
$250,000,000.00 |
Key
Personnel: |
|
Ted Chant
|
| Duration: |
|
2005 - 2006 |
| Owner: |
|
SNC Lavalin Inc. |
| Contact: |
|
Charlie Firman
(604) 684-3282 |
|