| Project Outline:
Chant monitored delivery progress, on behalf of Great
Lakes Power for this new 25 MW hydroelectric generating
facility, on a task-by-task basis.
Key features of the Project were:
- Installation of two Pelton turbines.
- Approximately 3 km of new intake tunnel and penstocks.
- Construction of a new 13 km, 69 kV transmission line.
| Owner: |
|
Canadian Hydro
Developers/Great Lakes Power Limited |
| Reference: |
|
Colin Clark,
(705) 941-5651 |
Key
Personnel: |
|
Ted Chant |
| Duration: |
|
2001 - 2002 |
|