Oldman River Hydro Project
Temporary Diversion Works
< Back
   

Project Outline:

  old man
   

The Project involved the construction of a temporary diversion and concrete retaining wall.

The work included:

  • Installation and subsequent removal of four 42" siphons over the existing spillway to divert water during construction of the wall.
  • Construction of a concrete retaining wall with twin 3.6m multi-plate culverts running from the existing diversion tunnel through the wall. This wall will act as a coffer dam for the construction of a powerhouse to be included in Atco's next contract.
Owner:   Atco Energen Inc.
Reference:   Lawrence DeBlois
(780) 420-7074
Construction
Project Value:
 
$1,250,000.00
Key Personnel:   Dwight Grieve
Mel Hicks
Duration:   April 2001
Consultant:   Nordic Acres Engineering
Reference:   Lance C. Bendiak, P. Eng.,
(403) 292-0370

 

 