Project Outline:
The Project involved the construction of a temporary diversion
and concrete retaining wall.
The work included:
- Installation and subsequent removal of four 42"
siphons over the existing spillway to divert water during
construction of the wall.
- Construction of a concrete retaining wall with twin
3.6m multi-plate culverts running from the existing diversion
tunnel through the wall. This wall will act as a coffer
dam for the construction of a powerhouse to be included
in Atco's next contract.
| Owner: |
|
Atco Energen Inc. |
| Reference: |
|
Lawrence DeBlois
(780) 420-7074 |
Construction
Project Value: |
|
$1,250,000.00 |
| Key Personnel: |
|
Dwight Grieve
Mel Hicks |
| Duration: |
|
April 2001 |
| Consultant: |
|
Nordic Acres Engineering |
| Reference: |
|
Lance C. Bendiak, P. Eng.,
(403) 292-0370 |
|