Mayo-Dawson City
Transmission System Project
< Back
   
Project Outline:
  mayo
   

The Project involved the detailed engineering, final design, construction, operator training, commissioning and start-up of a 223 km transmission line between Dawson City and Mayo, Yukon.

The Project included:

  • 223 km of 66 kV wooden pole transmission line system.
  • 36 km of wooden pole distribution line.
  • Complete construction of one new 200 KVA transformer station.
  • Modifications to two generating stations.
  • Modifications to two transformer stations.
  • Construction in environmentally sensitive areas through limited access points.
  • Work in permafrost conditions.
  • Line and station restoration.
  • 20% First Nation/local business content.
Owner:   Yukon Energy Corporation
Reference:   Dave Morrison
(867) 393-5400
Construction
Project Value:
 
$36,000,000.00
Key Personnel:   Skip Brewster
John Lantz
Scott Morrison
Duration:   April 2001 - November 2002

 

 

 