| Project Outline:
The Project involved the detailed engineering, final design, construction, operator training, commissioning and start-up of a 223 km transmission line between Dawson City and Mayo, Yukon.
The Project included:
- 223 km of 66 kV wooden pole transmission line system.
- 36 km of wooden pole distribution line.
- Complete construction of one new 200 KVA transformer
station.
- Modifications to two generating stations.
- Modifications to two transformer stations.
- Construction in environmentally sensitive areas through
limited access points.
- Work in permafrost conditions.
- Line and station restoration.
- 20% First Nation/local business content.
| Owner: |
|
Yukon Energy Corporation |
| Reference: |
|
Dave Morrison
(867) 393-5400 |
Construction
Project Value: |
|
$36,000,000.00 |
| Key Personnel: |
|
Skip Brewster
John Lantz
Scott Morrison |
| Duration: |
|
April 2001 - November 2002 |
|