Project Outline:
This project will see the construction of a second powerhouse
at the Brilliant Dam, adding approximately 120 MW of hydroelectric
capacity to the Lower Kootenay River system. The Brilliant
Expansion Consortium, composed of Chant Construction, Skanska
International Civil Works and SNC-Lavalin, is constructing
this design-build project.
The project includes the design and construction of a new
water intake, power tunnel, powerhouse, access tunnel and
tailrace channel adjacent to the eastern end of the operating
Brilliant Dam.
| Owner: |
|
Brilliant Expansion Power Corporation |
| Reference: |
|
Bill Freeman
(250) 387-0243 |
Construction
Project Value: |
|
$170,000,000.00 |
Key
Personnel: |
|
Ted Chant
Alan Avery
Skip Brewster
Elena Cigala-Fulgosi
Peter Walton |
| Duration: |
|
2003 - 2006 |
|