Anjigami / Sault 230 kV Line Reinforcement Project

< Back
   
Project Outline:

The project involved:

  • Pre-engineering of three alternatives to upgrade an existing 115kV distribution system to 230kV between Sault Ste. Marie and Wawa, Ontario.
  • Based on costs and performance, selected a high voltage conductor for the new distribution system.
  • Upon selection of preferred structure type, developed a detailed construction estimate for the design, procurement, construction management and construction of the preferred alternative system.
Year:   2003
Key Personnel:   Ted Chant
Alan Avery
Owner:   Great Lakes Power Ltd.
Reference:   Berk Gursoy