| Project Outline:
The project involved:
- Pre-engineering of three alternatives to upgrade an existing
115kV distribution system to 230kV between Sault Ste. Marie and
Wawa, Ontario.
- Based on costs and performance, selected a high voltage conductor for the new distribution system.
- Upon selection of preferred structure type, developed a detailed construction estimate for the design, procurement, construction management and construction of the preferred alternative system.
| Year: |
|
2003 |
| Key Personnel: |
|
Ted Chant
Alan Avery |
| Owner: |
|
Great Lakes Power Ltd. |
| Reference: |
|
Berk Gursoy
(705) 759-7600 |
|