Project Outline:
Design and build a transformer containment in accordance to the Ministry of the Environment standards.
The work scope included:
- Detailed design of containment system
- Excavation of substation around transformers
- Pouring new concrete walls and base slab
- Building fire retardant walls between transformers
- Covering area with impermiable membrane
- Covering membrane with clean stone, and
- Reinstalling fence.
| Project Value: |
|
$ 336,000.00 |
| Duration: |
|
September - November 2006 |
Key
Personnel: |
|
Alan Avery
Wayne Olmstead |
| Owner: |
|
Brookfield Power
Mississagi Power Operations |
| Reference: |
|
Phil Reader, General Manager
(705) 842-3377 |
|