Project Outline:
Concrete rehabilitation of approximately 56m2 spillway deck repairs and rehabilitation of two concrete nose piers.
The work scope included:
- Site investigation and methodology development to complete repairs
- Demolition and disposal of broken deck concrete
- Pour new deck patches and caulk joints
- Chip/demolish old concrete on nose piers
- Set pre-fab steel on nose piers and backfill with concrete, and
- Repair handrail.
| Project Value: |
|
$ 190,000.00 |
| Duration: |
|
September - November 2006 |
Key
Personnel: |
|
Alan Avery
Scott Morrison |
| Owner: |
|
Brookfield Power
Mississagi Power Operations |
| Reference: |
|
Phil Reader, General Manager
(705) 842-3377 |
|