| Project Outline:
Performing a development of pre-feasibility investigation and report on two potential run of river hydroelectric sites on the Pic River in North Western Ontario
The Project involved:
- Site Survey
- Conceptual Design
- Water-to-wire supplier recommendations
- Geotechnical Assessment
- Concept level Design-build construction estimate
Project
Value: |
|
$75,000.00 |
Year:
|
|
2007 (3 months) |
Key
Personnel: |
|
Tim Saville
Anthony Ramirez
Rafael Sanchez
Andy Valentine |
| Owner: |
|
Ojibways of the Pic River First Nation |
| Reference: |
|
Byron LeClair