Pic River Pre-Feasibility Study

< Back
   
Project Outline:

Comerford Transformer Replacement ProjectPerforming a development of pre-feasibility investigation and report on two potential run of river hydroelectric sites on the Pic River in North Western Ontario

The Project involved:

  • Site Survey
  • Conceptual Design
  • Water-to-wire supplier recommendations
  • Geotechnical Assessment
  • Concept level Design-build construction estimate
Project
Value:
 
$75,000.00
Year:
  2007 (3 months)
Key
Personnel:
  Tim Saville
Anthony Ramirez
Rafael Sanchez
Andy Valentine
Owner:   Ojibways of the Pic River First Nation
Reference:   Byron LeClair
(807) 229-1749

 

 

 