Project Outline:
One 1924, double "camel back" horizontal turbine/generator replaced with two new, vertical propeller units (500 kW each).
The work scope included:
- Project management of consultant during the design process
- Liaison with FERC during permitting and reporting phases
- Technical review of manufacturer's shop drawings and approval for manufacture
- Project scheduling, budget position tracking and reporting
- Project management oversight from tendering through construction management phase.
| Project Value: |
|
$ 1,100,000 USD |
| Duration: |
|
2006 |
Key
Personnel: |
|
Richard McGivern
Barry Burnside |
| Owner: |
|
Brookfield Power, New York |
| Reference: |
|
Joe Viau,
Manager of Profit Improvements Projects
(315) 413-2776 |
| Consultant: |
|
Kleinschmidt Assoc. |
| Contact: |
|
Leslie Carrow
(207) 487-3328 |
|