Project Outline:
The scope of work included:
- Erect a float bridge system to access and move materials across the tailrace
- Install new rebar dowels ever 5" on centre with one #5 bar running midline on new and existing rebar
- Form with birdsmouths as required to allow pumped 4000# concrete into the voids under the wall
- Strip forms, plug tie holes and remove the bridge system from the trailrace
- Cleanup and demobilize.
Project
Value: |
|
$81,000.00 USD |
Duration :
|
|
July 2007 |
Key
Personnel: |
|
Mike Edwards
Richard McGivern |
| Owner: |
|
Brookfield Power New York
|
| Reference: |
|
Marty Lachut
(315) 413-2746 |
|