Fulton Hydro Tailrace Wall Repair

< Back
   
Project Outline:

The scope of work included:

  • Erect a float bridge system to access and move materials across the tailrace
  • Install new rebar dowels ever 5" on centre with one #5 bar running midline on new and existing rebar
  • Form with birdsmouths as required to allow pumped 4000# concrete into the voids under the wall
  • Strip forms, plug tie holes and remove the bridge system from the trailrace
  • Cleanup and demobilize.
Project
Value:
 
$81,000.00 USD
Duration :
  July 2007
Key
Personnel:
  Mike Edwards
Richard McGivern
Owner:   Brookfield Power New York
Reference:   Marty Lachut
(315) 413-2746

 

 

 