Project Outline:
The Project involved the rehabilititation of the spillway face, tainter deck joints, and patching of the spillway on downstream side of the dam.
The work involved:
- Replacement of deteriorated concrete on upstream face of the spillway. Concrete is normally below the headpond water level (244.0 foot long spillway)
- Concrete patching on tainter deck joints and downstream face of dam at designated locations, and
- Secured temporary 24 ft long steel bulkheads to the face of the spillway for access when dewatered.
| Owner: |
|
Brookfield Hydro |
| Reference: |
|
Jeff Bernard
(315) 413-2746 |
Project
Value: |
|
$1,000,000.00 USD |
| Key Personnel: |
|
Richard McGivern
Wayne Brooks
Dwight Grieve
John Lantz |
| Duration: |
|
July 2006 - January 2007 |
|