Project Outline:

  Bennetts Bridge
   

The Project involved the rehabilititation of the spillway face, tainter deck joints, and patching of the spillway on downstream side of the dam.

The work involved:

  • Replacement of deteriorated concrete on upstream face of the spillway. Concrete is normally below the headpond water level (244.0 foot long spillway)
  • Concrete patching on tainter deck joints and downstream face of dam at designated locations, and
  • Secured temporary 24 ft long steel bulkheads to the face of the spillway for access when dewatered.
Owner:   Brookfield Hydro
Reference:   Jeff Bernard
(315) 413-2746
Project
Value:
 
$1,000,000.00 USD
Key Personnel:   Richard McGivern
Wayne Brooks
Dwight Grieve
John Lantz
Duration:   July 2006 - January 2007

 


 