| Project Outline:
This project involved safety management, quality control and close out for:
- Concrete upgrades to a portion of the exterior wall of the station, specifically the downstream side of Bay # 3.
- Removal and replacement of a concrete walkway over the trashracks
- Installation of a short return to the river/station retaining wall
- Removal of spalled and organic material from the upstream station wall and patching of same
- Extending the river/station retaining wall to inhibit river boil back erosion.
Project
Value: |
|
$54,000.00 |
Duration :
|
|
June 2007 |
Key
Personnel: |
|
Gene Schoonmakerfranczek |
| Owner: |
|
Brookfield Power New York
|
| Reference: |
|
Marty Lachut
(315) 593-5209 |
|