| Project Outline:
Construction of a new five-span, 268m bridge to twin Highway 43 over the Smoky River east of Grande Prairie, Alberta
The Project involved:
- A cast-in-place deck on steel girders.
- 3,600 cubic metres of concrete.
- 432 tonnes of reinforcing steel.
- 934 tonnes of steel structural.
- Access berms into the river.
- Cast in place pier and abutments.
- Over 1,200 linear metres of H-pile and caisson foundations.
| Owner: |
|
Alberta Infrastructure |
| Reference: |
|
Tom Loo
(708) 624-2280 |
Tender Value:
|
|
$7,800,000.00 |
| Key Personnel:
|
|
Skip Brewster
Dwight Grieve
Dan Sherin |
| Duration: |
|
2000 - 2001 |
| Consultant:
|
|
Associated Engineering Alberta Ltd. |
| Reference: |
|
Dr. S. Balakrishnan |
|